工况定制,成套集成,系统交付 Engineered to duty, integrated as one set, delivered as a system
从 CNG 减压、燃气调压到 LNG 气化储存,每一台撬装都按项目的流量、进出口压力与介质条件单独出图、单独验收。 From CNG pressure reduction to gas regulation and LNG vaporizing, every skid is drawn and tested against the project's flow, pressures and medium.






覆盖多元场景,稳定供气输出 Diverse scenarios, steady gas output
厂区自备气站,为熔炼、热处理、烘干等连续用气设备稳定供气。Captive gas stations feeding melting, heat treatment and drying lines.
看这类工况用什么设备Equipment for this duty 居民燃气Residential supply城镇独立小区、公建用户的区域供气,低噪音、无人值守运行。District supply for residential communities and public buildings, unattended.
看这类工况用什么设备Equipment for this duty 门站调峰City gate & peaking城市门站与调峰站,用气高峰补气,双路切换不断供。City gate and peaking stations covering demand spikes without interruption.
看这类工况用什么设备Equipment for this duty 燃气储存Gas storageCNG 瓶组、储罐与集装格,把气量存下来,把交期留出来。CNG banks, tanks and frames that hold gas volume and buy schedule margin.
看这类工况用什么设备Equipment for this duty 气体充装Cylinder filling低温液体气化充装站,氧气、氮气、氩气、二氧化碳成套配置。Cryogenic vaporizing and filling stations for O₂, N₂, Ar and CO₂.
看这类工况用什么设备Equipment for this duty 集中供气Centralized supply园区与厂区集中供气,一台设备服务多台炉窑、多条产线。Park and plant-wide supply: one system serving many furnaces and lines.
看这类工况用什么设备Equipment for this duty
十多年风雨,初心没变Fifteen years, same discipline
河北泰燃能源科技有限公司是河北省专业气体设备与燃气设备制造企业之一,位于河北省邢台市南宫市经济开发区(西区)朝阳街2号,注册资金 1000 万元。公司拥有各项生产资质 20 余项,大专以上学历 28 人、高级工程师 1 人、工程师 4 人、助理工程师 6 人。 Hebei Tairan Energy Technology Co., Ltd. is one of Hebei's specialised manufacturers of gas and gas-supply equipment, based in the West Zone (Chaoyang St No.2) of the Nangong Economic Development Zone, Nangong, Xingtai, with RMB 10 million registered capital, 20+ manufacturing permits and a 28-strong college-educated staff including one senior engineer, four engineers and six assistant engineers.
公司外聘天津、重庆等地气体设备制造专家,并与邢台市特种设备监督检验研究所等单位联合培训机加工、特种焊工、组装调试等技术骨干,形成一支经验丰富的气体设备设计与制造团队。 Outside specialists from Tianjin and Chongqing work with the company, and technical staff are trained jointly with the Xingtai Special Equipment Inspection Institute — machining, special welding, assembly and commissioning.
深耕气体装备,筑牢交付底气 Deep experience in gas equipment — the grounding behind every delivery
公司实力Manufacturing base
占地 1 万平米,生产与检测设备齐全,20 多项资质在手,60 名熟练生产人员,库存与半成品备料充足。10,000 m² site, complete production and testing equipment, 20+ permits and 60 skilled staff.
生产设备Production lines
多条燃气设备与气体设备生产线,可生产各类规格撬装,每台产品出厂前完成检测,按国家标准验收。Multiple gas-equipment lines covering all standard skid sizes, each unit tested before shipment.
高效交付Lead time
产能充足并保有现货与半成品库存,大幅压缩生产周期,按合同交期如约发货。Finished and semi-finished stock shortens production cycles; shipments follow the contracted date.
运输配送Logistics
与多家专业物流公司深度合作,可按客户要求配送到工程现场,撬装整机运输、到场即装。Partner carriers deliver skids to site, ready to install on arrival.
专业服务Service
售前现场勘察、针对性出方案;售中全程施工指导与培训;售后快速响应,保障工程按期开展。Pre-sales site survey and tailored scheme, on-site guidance, fast after-sales response.
资质与荣誉Licences & honours
特种设备制造许可、安装许可(GC2)、纳税信用 A 级等资质与荣誉一览。Manufacturing and installation licences, A-grade tax credit and more.
查看资质荣誉View →各类项目落地,实景见证实力 Projects delivered, strength seen on site
2026-08-162 套 1000 Nm³/h LNG 气化站 + 2 套 1000 Nm³/h CNG 减压站,2025 年 4 月签约、12 月完成验收,跨冬季交付。Four gas supply systems for an Air Force flight academy
查看案例Open case →
2026-07-25低温储罐 + 泵撬 + 高压气化器 + 充装排成套,围绕“绿色节能、高效质优”配置。Cryogenic vaporising and filling station
查看案例Open case →
2026-07-25按氢气低密度、易泄漏、易氢脆特性设计,三级减压、金属硬密封、出厂氦检漏。Hydrogen skid: three stages, tight sealing
查看案例Open case →
2026-05-10以核电与工业气体项目积累的制造与文件体系,支撑海外国家石油公司的验收标准。From CNNC to Pertamina: how the equipment line was built
查看案例Open case →
2026-05-10出口项目,两套大型 CNG 减压撬一次验收通过,标志燃气装备进入东南亚国家石油公司供应体系。Two large CNG reducing skids accepted by Pertamina first time
查看案例Open case →
2024-11-2615000 Nm³/h 燃气调压装置,面向西北地区长距离供气:进出口压差大,按级拆分并配超压切断与放散。15000 Nm³/h gas regulating unit for Xinjiang Shengneng
查看案例Open case →
2024-11-15油田生产与生活区燃气调压,1500 Nm³/h 调压柜,双路一备,出口压力按管网需求设定,超压自动切断。1500 Nm³/h gas regulating cabinet for Jianghan Oilfield
查看案例Open case →
2024-10-1850000 Nm³/h 城市燃气调压站:按门站进出口压力与调峰需求配置,是业绩清单中调压能力最大的项目。50000 Nm³/h city gas regulating station for Ankang Yihua
查看案例Open case →
2024-09-18120000 Nm³/h 级燃气调压柜,为公司业绩清单中调压流量最大的项目;多路并联、逐级降压,出口压力带稳定。120000 Nm³/h gas regulating cabinet for Shanxi Jinhao
查看案例Open case →
2023-09-255000 Nm³/h CNG 减压站:县域城燃供气,槽车来气经减压、换热后进入配气管网,冬季按最冷月流量校核。5000 Nm³/h CNG reducing station for Tongshan City Gas
查看案例Open case →
2023-03-08减压与计量同撬,出口压力按用户设定,配温压补偿与远传。300 Nm³/h CNG reducing and metering skid
查看案例Open case →
2023-03-08200 Nm³/h 级小型撬,两级减压配换热,适合餐饮、小型窑炉与偏远站点。200 Nm³/h CNG reducing skid
查看案例Open case →
2022-10-061500 Nm³/h 级,进口 20 MPa、出口 0.09 MPa,整撬约 2300 kg,两级减压配换热。1500 Nm³/h CNG reducing skid
查看案例Open case →
2022-10-065000 Nm³/h 单撬,进口 0.6–0.8 MPa、出口 0.2–0.4 MPa,−19~60℃ 环境,整撬 2100 kg。5000 Nm³/h gas regulating and metering skid
查看案例Open case →
2022-10-06HBTR-NG/200,计量为主、调压为辅,可用于企业内部核算与结算。200 Nm³/h gas metering skid
查看案例Open case →
2022-10-06800 Nm³/h 柜式调压,进口 0.9–0.99 MPa、出口 20–25 kPa,一级调压满足民用压力带。800 Nm³/h gas pipeline regulating cabinet
查看案例Open case →
2022-10-06空温式打底 + 水浴式补热,1 级换热 2 级减压,出口 10–15 kPa。500 Nm³/h LNG vaporizing skid
查看案例Open case →
2022-10-0624 瓶位、单瓶 205 L、总容积 4920 L,22 MPa 储气,逐瓶试验建档。24-position CNG cylinder bank
查看案例Open case →
2022-10-06DWB150/1500-165,进 0.2–0.8 MPa、出 15 MPa、67 kW,双列一开一备。1000 Nm³/h cryogenic pump skid
查看案例Open case →
2022-10-06HBTR-NG/400 单路柜,结构紧凑,适合厂区燃气入口与商业综合体。400 Nm³/h single-train regulating cabinet
查看案例Open case →
2022-10-06880 Nm³/h 箱式调压,出口 20–25 kPa,低噪音设计适合居民区。NG/880 Nm³/h regulating cabinet
查看案例Open case →
2022-05-156000 Nm³/h LNG 汽化设备,配套施工现场与生产用气,按供气连续性配置双系列,检修不停气。6000 Nm³/h LNG vaporising unit for Shandong Yijian
查看案例Open case →
2022-02-155000 Nm³/h LNG 汽化设备,供城市管网与工业用户:气化、复热、调压、计量成套,按最冷月流量校核气化能力。5000 Nm³/h LNG vaporising package for Jiaozhou Taikun Gas
查看案例Open case →
2022-02-1120000 Nm³/h 水浴式汽化器,面向大流量连续供气:热水浴换热,出口温度稳定,不因环境低温掉量。20000 Nm³/h water-bath vaporiser for Hubei Shuaichang
查看案例Open case →
2021-06-203000 Nm³/h 燃气调压柜,配套仪表与工业炉窑用气:双路一备,出口压力波动控制在设定带内。3000 Nm³/h gas regulating cabinet for Jingyi
查看案例Open case →
2021-05-051000 Nm³/h CNG 减压站,油田生产与生活用气:槽车来气两级减压、换热后进管网,撬装到场接管。1000 Nm³/h CNG reducing station for Chunfeng Oilfield
查看案例Open case →
2021-03-04100 Nm³/h 小型 CNG 减压站:实验室与校区用气,紧凑撬装、占地小,出口压力可精细调节。100 Nm³/h CNG reducing station for Harbin Engineering University
查看案例Open case →
2021-02-05为核工业厂区配套 300 Nm³/h LNG 汽化设备,替代瓶装与柴油用能,按厂区用气点的压力与流量配置气化、调压与计量单元。300 Nm³/h LNG vaporising unit for CNNC 404
查看案例Open case →
2020-12-252000 Nm³/h LNG 汽化设备,为矿区替代柴油与瓶装气:空温式气化配调压计量,冬季按低温工况校核。2000 Nm³/h LNG vaporising package for Anshan Mining
查看案例Open case →
2018-11-1510000 Nm³/h 级 CNG 减压站:槽车来气经两级减压、换热后送入管网,是公司业绩清单中流量最大的 CNG 减压项目之一。10000 Nm³/h CNG reducing station for Qingyang Ruihua
查看案例Open case →行业动态前沿,同步技术更新 Industry front line — technology kept current
新国标JB/T 11491-2026已经实施,你的撬装式燃气减压装置跟得上节奏了吗?新国标JB/T 11491-2026已经实施,你的撬装式燃气减压装置跟得上节奏了吗?新国标JB/T 11491-2026已经实施,你的撬装式燃气减压装置跟得上节奏了吗? - 河北泰燃能源科技有限公司2026.11.11
天然气调压撬选型,五个参数先搞清楚天然气调压撬选型,五个参数先搞清楚天然气调压撬选型,五个参数先搞清楚 - 河北泰燃能源科技有限公司2026.10.03
冬季保供战提前打响,LNG气化设备迎来采购高峰冬季保供战提前打响,LNG气化设备迎来采购高峰冬季保供战提前打响,LNG气化设备迎来采购高峰 - 河北泰燃能源科技有限公司2026.09.29
国家管网上载点加速开放,零散气“颗粒归仓”国家管网上载点加速开放,零散气“颗粒归仓”国家管网上载点加速开放,零散气“颗粒归仓” - 河北泰燃能源科技有限公司2026.09.29
雄安新区燃气设施智能化升级启动,调压设备迎来“智慧”新标准雄安新区燃气设施智能化升级启动,调压设备迎来“智慧”新标准雄安新区燃气设施智能化升级启动,调压设备迎来“智慧”新标准 - 河北泰燃能源科技有限公司2026.09.29
天然气为什么要掺氢气?对工业用户到底有啥影响?天然气为什么要掺氢气?对工业用户到底有啥影响?天然气为什么要掺氢气?对工业用户到底有啥影响? - 河北泰燃能源科技有限公司2026.09.29
空温式和水浴式气化器,到底怎么选?空温式和水浴式气化器,到底怎么选?空温式气化器零运行成本但怕低温结霜,水浴式稳定可靠但有能耗。选型关键看三点:当地最低气温、用气规模、有无余热可用。行业主流方案是空温…2026.09.29
中东能源转型加速,中国燃气设备出海正当时中东能源转型加速,中国燃气设备出海正当时中东能源转型加速,中国燃气设备出海正当时 - 河北泰燃能源科技有限公司2026.08.31
新规落地,油气基础设施投资提速,河北泰燃CNG上载减压撬迎来新机遇新规落地,油气基础设施投资提速,河北泰燃CNG上载减压撬迎来新机遇新规落地,油气基础设施投资提速,河北泰燃CNG上载减压撬迎来新机遇 - 河北泰燃能源科技有限公司2026.08.19
新国标即将实施,你的CNG供气装置合规吗?河北泰燃带你读懂GB/T 47548-2026新国标即将实施,你的CNG供气装置合规吗?河北泰燃带你读懂GB/T 47548-2026English2026.08.18
河北泰燃助力国防后勤保障:4套天然气供应设备护航空军某飞行学院冬季供暖河北泰燃助力国防后勤保障:4套天然气供应设备护航空军某飞行学院冬季供暖English2026.08.16
河北泰燃BOG回收机组:让LNG槽车“最后一口气”变成真金白银河北泰燃BOG回收机组:让LNG槽车“最后一口气”变成真金白银河北泰燃BOG回收机组:让LNG槽车“最后一口气”变成真金白银 - 河北泰燃能源科技有限公司2026.07.25
河北泰燃氢气调压撬:以三级减压与极致密封,护航氢能产业安全高效发展河北泰燃氢气调压撬:以三级减压与极致密封,护航氢能产业安全高效发展English2026.07.25
河北泰燃低温液体气化充装站设备:以“绿色节能、高效质优”赋能工业气体产业升级河北泰燃低温液体气化充装站设备:以“绿色节能、高效质优”赋能工业气体产业升级河北泰燃低温液体气化充装站设备:以“绿色节能、高效质优”赋能工业气体产业升级 - 河北泰燃能源科技有限公司2026.07.25
拿下俄罗斯“签证”!河北泰燃燃气调压柜获EAC认证,正式挺进欧亚市场拿下俄罗斯“签证”!河北泰燃燃气调压柜获EAC认证,正式挺进欧亚市场从中国邢台到俄罗斯莫斯科,距离超过6000公里。但今天,这个距离被河北泰燃的一纸证书“清零”。 近日,河北泰燃能源科技有限公司传来重…2026.05.21
涨/超压了怎么办?CNG减压撬“涨压”故障自查指南涨/超压了怎么办?CNG减压撬“涨压”故障自查指南涨/超压了怎么办?CNG减压撬“涨压”故障自查指南2026.05.06
天然气加臭机选型指南:加臭量怎么算?设备怎么配?天然气加臭机选型指南:加臭量怎么算?设备怎么配?在燃气输配系统中,加臭机是一道至关重要却容易被忽视的安全防线。它的任务简单却关键:向无色无味的天然气中注入微量臭剂,使泄漏时能被人类…2026.04.29
压缩天然气减压撬安全使用指南,河北泰燃工程师划重点压缩天然气减压撬安全使用指南,河北泰燃工程师划重点压缩天然气减压撬是高压设备,操作不当可能引发安全事故。河北泰燃能源科技有限公司技术团队结合多年现场经验,为用户梳理压缩天然气减压撬安…2026.04.05
CNG减压撬日常巡检清单CNG减压撬日常巡检清单在CNG减压撬的运行管理中,日常巡检是保障设备安全、稳定、经济运行的最基本手段。许多故障在发生前都会有先兆,如压力波动、轻微泄漏、异…2026.04.04
LNG气化站BOG排放量太大怎么办?回收与利用方案全解析LNG气化站BOG排放量太大怎么办?回收与利用方案全解析“上个月储罐安全阀又起跳了两次,每次都能听到气体放散的声音,感觉真金白银就这么白白跑掉了。”不少LNG气化站的运营人员都有这样的烦恼…2026.04.03
CNG高压软管价格之谜:派克凭什么贵几倍?国产的到底能不能用住?CNG高压软管价格之谜:派克凭什么贵几倍?国产的到底能不能用住?在CNG减压撬、加气站卸气柱、CNG槽车装卸等场景中,高压软管是连接设备与槽车的“生命线”,每天承受着20-25MPa的高压冲击,还…2026.04.02
钻井天然气发电机组配套CNG减压撬:助力油气开采绿色转型钻井天然气发电机组配套CNG减压撬:助力油气开采绿色转型钻井天然气发电机组配套CNG减压撬:助力油气开采绿色转型 在油气勘探开发领域,“气代油”正成为一股不可逆转的绿色浪潮。用天然气发电替…2026.03.24
CNG上载减压撬:零散气源接入国家管网的关键装备CNG上载减压撬:零散气源接入国家管网的关键装备CNG上载减压撬:零散气源接入国家管网的关键装备 随着国家管网“全国一张网”建设的深入推进,越来越多的零散气源正通过CNG上载方式接…2026.03.22
CNG卸车臂:压缩天然气装卸作业的关键设备CNG卸车臂:压缩天然气装卸作业的关键设备CNG卸车臂:压缩天然气装卸作业的关键设备 在CNG母站、子站及工业用户卸气站的日常运营中,CNG卸车臂承担着连接槽车与站内管道的核…2026.03.19
LNG卸车臂:液化天然气装卸作业的核心装备LNG卸车臂:液化天然气装卸作业的核心装备LNG卸车臂:液化天然气装卸作业的核心装备 在LNG接收站、加气站、气化站的日常运营中,有一个关键设备承担着连接槽车与储罐的使命——…2026.03.18
CNG高压卸车软管的定期检查与维护CNG高压卸车软管的定期检查与维护CNG高压卸车软管的定期检查与维护 在CNG减压撬的日常运行中,高压卸车软管是连接槽车与站内管道的核心部件。由于其工作状态相对隐蔽,…2026.03.17
氢用管道新国标发布:氢气减压撬如何选型与设计?氢用管道新国标发布:氢气减压撬如何选型与设计?氢用管道新国标发布:氢气减压撬如何选型与设计? 2025年,国家正式发布了GB/T 20801.5-2025《压力管道规范 第5部分…2026.03.16
CNG减压撬小流量时喘振原因分析及解决方法CNG减压撬小流量时喘振原因分析及解决方法CNG减压撬小流量时喘振原因分析及解决方法 最近接到几位用户反馈,CNG减压撬在小流量工况下运行时,会出现压力波动、设备振动、发出异…2026.03.15
燃气调压柜能否自购?为什么燃气公司总让买他们的?企业如何应对?燃气调压柜能否自购?为什么燃气公司总让买他们的?企业如何应对?燃气调压柜能否自购?为什么燃气公司总让买他们的?企业如何应对? 最近不少企业客户咨询我们:工厂要通天然气,燃气公司要求必须买他们的调…2026.03.14
CNG减压撬安全距离及企业自备站设备配置指南CNG减压撬安全距离及企业自备站设备配置指南CNG减压撬安全距离及企业自备站设备配置指南 近年来,随着LNG价格波动加剧,越来越多的工业企业将目光投向CNG点供方案。对于计划建…2026.03.12理清订购步骤,交付全程可控。 Clear steps from ordering to delivery — controlled all the way
把工况参数发过来,
24 小时拿到图纸与报价。
Send your duty data — drawings and quotation within 24 hours
四项给全就能开工:介质、流量、进出口压力、现场条件。技术工程师按参数出流程图、设备清单与逐项报价,不做模板报价单。 Four items are enough to start: medium, flow, inlet/outlet pressure and site conditions. You get a P&ID, equipment list and an itemised quotation — no template sheet.
- 01介质Medium
- 02流量Flow rate
- 03进出口压力Inlet / outlet pressure
- 04现场条件Site conditions