7×24 服务热线Sales hotline 400-151-0319 海外 / 手机(微信同号)Overseas / mobile (WeChat ID) +86 150-7688-0801 厂址Address:河北省邢台市南宫市经济开发区(西区)朝阳街2号No.2 Chaoyang St, West Zone, Nangong EDZ, Xingtai, Hebei
Products / 产品库 · 低温液体泵撬

零下 162℃,也送得稳−162 °C, still pumped steady

低温液体泵撬:把 LNG、液氮、液氧从储罐稳送到气化器或充装位,不汽蚀、不憋泵。Cryogenic pump skid: LNG, LN₂ or LOX delivered from tank to vaporiser or filling point without cavitation.

首页Home/产品中心Products/低温液体泵撬Cryogenic pump skid
低温液体泵撬
01 / Overview

产品概述Product overview

低温泵撬的核心矛盾是“冷”和“汽蚀”。液氧 −183℃、液氮 −196℃、LNG −162℃,泵前任何一段管路吸热都会产生气泡,一旦汽蚀,泵就丢压甚至抱死。所以撬上必须做三件事:泵前管路保冷、设预冷/排气回路、把泵池与储罐的静压头算准。DWB150/1500-165 型泵撬进口 0.2–0.8 MPa、出口 15 MPa、配 67 kW 电机,双列配置一开一备。Cold and cavitation dominate: insulation, a cool-down/vent loop and correct static head. DWB150/1500-165 runs 0.2–0.8 MPa in, 15 MPa out, 67 kW, dual train.

充装站场合,泵后接高压气化器与充装排;气化站场合,泵用于把液体送进中压气化器。两种流程的泵型、密封与控制逻辑不同,不能互换。Filling plants need a high-pressure vaporiser and manifold after the pump; stations feed a medium-pressure vaporiser instead.

低温液体泵撬
低温液体泵撬:泵冷端保冷、出口回流与安全阀成组,启泵按预冷流程走。Cryogenic pump skid: insulated cold end, outlet recirculation and relief valve grouped; start-up follows pre-cooling.
A / Working principle

工作原理:低温泵为什么怕气蚀Working principle: why cryogenic pumps fear cavitation

低温液体泵(离心或往复)把储罐里的 LNG、液氮、液氧等加压后送出。它的特殊之处在于介质接近饱和温度:任何一点压力下降都会让液体闪蒸成气泡,气泡进泵后在叶轮处崩溃,造成气蚀——振动、噪声、流量下降,长期运行会打坏叶轮和密封。Cryogenic pumps — centrifugal or reciprocating — pressurise LNG, LN2 or LO2 out of a tank. Their peculiarity is that the liquid sits close to saturation: any local pressure drop flashes it into vapour, the bubbles collapse at the impeller, and cavitation follows — vibration, noise, lost flow, and eventually damaged impeller and seals.

所以泵的选型核心不是扬程,而是 NPSH:净正吸入压头必须留有余量。工程上的办法是提高储罐液位、降低泵进口高度、加大吸入管径、减少弯头、必要时设诱导轮或预冷回路。泵坑布置与吸入管保温也直接影响 NPSH。The sizing criterion is therefore NPSH, not head: net positive suction head must carry margin. Practical measures are a higher tank level, a lower pump inlet, a larger suction line, fewer bends, and if needed an inducer or a cool-down loop. Pit layout and suction insulation both affect NPSH.

泵撬通常集成泵、变频或软启动、密封气/吹扫系统、进出口阀门、仪表与保冷。往复泵还要考虑脉动与缓冲罐。出厂前的冷试与联锁测试不能省——低温泵一旦在低温下干转,损坏是不可逆的。A pump skid packs the pump, VFD or soft starter, seal gas or purge, valves, instruments and insulation. Reciprocating units add pulsation damping and a buffer. Cold testing and interlock verification before shipment are not optional — a cryogenic pump run dry is damaged irreversibly.

02 / Structure

结构组成What is on the skid

01
低温离心/柱塞泵:双列布置,一开一备。Dual cryogenic pumps, duty/standby.
02
泵池与保冷:真空或珠光砂保冷,泵前管路包覆。Cold box with vacuum or perlite insulation.
03
预冷与排气回路:开车前排出气相,防汽蚀。Cool-down and vent loop against cavitation.
04
安全回流:超压回流至储罐。Over-pressure return to tank.
05
仪表与联锁:出口压力、电机电流、轴承温度联锁停泵。Interlocks on pressure, current and bearing temperature.
06
撬体与防爆:型钢底座、防爆接线与接地。Skid base, Ex wiring, earthing.
低温液体泵撬
撬架侧视:泵、汽化器与控制箱同框,现场只接电源与工艺管。Side view: pump, vaporizer and control box on one frame; site work is power and piping only.
03 / Advantages

核心优势Why this design

  • 双列一开一备:检修不停产。Duty/standby, no production stop.
  • 防汽蚀设计:预冷回路与静压头计算随机出图。Cavitation control designed with the skid.
  • 高压段成熟:15–16.5 MPa 出口用于充装与钢瓶检漏。15–16.5 MPa outlet proven for filling.
  • 联锁完整:超压、超温、过流三重保护。Triple protection.
Gallery / 产品图片

产品实拍Product photos

低温液体泵撬 · 泵与管路 1低温液体泵撬 · 泵与管路 2低温液体泵撬 · 泵与管路 3

低温液体泵撬 · 泵与管路Cryogenic pump skid — pump and piping 点击图片放大查看。 Click to enlarge.

Models / 规格与实拍

按规格挑,点进去看现场实拍Pick a size, see the site photos

同一个型号,照片比文字更能说明做工:撬体骨架、管路走向、阀组排布、接地点和保温层都在里面。选一个规格,进去看它在车间和现场的实拍。Skid frame, piping runs, valve layout and insulation, shown as built.

04 / Specification

技术参数Technical data

型号ModelDWB150/1500-165DWB150/1500-165
气化当量流量Equivalent flow1000 Nm³/h1000 Nm³/h
进口压力Inlet0.2–0.8 MPa0.2–0.8 MPa
出口压力Outlet15 MPa15 MPa
设计压力Design16.5 MPa16.5 MPa
电机功率Motor67 kW67 kW
配置Configuration双列,一开一备Dual, duty/standby
介质MediumLO₂ / LN₂ / LAr / LNGLO₂ / LN₂ / LAr / LNG

表中为该系列典型配置。项目流量、介质与进出口压力不同时按工况单独设计,参数以合同技术文件为准。Typical configuration; units are engineered per duty and the contract data sheet governs.

B / Selection

选型与计算要点Selection points

01
先算 NPSH 余量 按储罐最低液位、最高液体温度与最大流量计算可用 NPSH,再与泵的必需 NPSH 比较并留余量。余量不足的泵,运行中一定会间歇性气蚀。Start from NPSH margin Available NPSH is computed at the lowest tank level, highest liquid temperature and maximum flow, then compared with the pump's required NPSH plus margin. Short margin means intermittent cavitation in service.
02
泵型选择 大流量连续输送用离心泵,结构简单、维护少;高压小流量或需要精确计量时用往复泵,但要注意脉动与汽蚀余量要求更高。Pump type Centrifugal suits continuous high flow with simple maintenance; reciprocating suits high head at low flow and precise dosing, at the cost of pulsation and a higher NPSH requirement.
03
密封与吹扫 低温泵的轴封是薄弱环节。要确认密封形式(机械密封、迷宫+吹扫)与吹扫气源(干燥氮气)是否可靠;吹扫中断会导致结冰卡死。Seals and purge The shaft seal is the weak point. Confirm the seal type — mechanical, or labyrinth with purge — and that a dry nitrogen purge is reliable; losing purge freezes the seal.
04
保冷与预冷 泵与吸入管必须保冷,冷箱或保冷层破损会带来持续漏热与气蚀。首次启动或长期停机后要按预冷程序降温,不能直接全速启动。Insulation and cool-down Pump and suction must be insulated; a broken cold box causes continuous heat leak and cavitation. First start or after a long stop, follow the cool-down procedure — never start at full speed.
05
联锁与保护 低液位、低出口压力、高振动、密封温度异常都要联锁停泵。这些保护在调试阶段就要逐项验证并记录。Interlocks Low level, low discharge pressure, high vibration and abnormal seal temperature all trip the pump. Verify and record each interlock during commissioning.
05 / Duty

适用工况Typical duties

气瓶充装站Cylinder filling plantsLNG 气化站送液LNG station feed工业气体工厂Industrial gas works空分与储配ASU and storage
Fit / 适用与边界

适合什么工况,什么情况不适用Where it fits, and where it does not

这套设备适合Best for

  • 可把低温液体增压输送,适应远距离与高扬程Pressurises cryogenic liquid for distance and head
  • 变频调节,流量可按需变化VFD control for variable flow
  • 整撬含预冷与回气管路,启动受控Pre-cool and vapour return built into the skid
  • 出口压力、温度、振动可监测Discharge pressure, temperature and vibration monitored

需要提前确认的边界Check before ordering

  • 对净正吸入压头敏感,入口温度与管路阻力需核算Sensitive to NPSH; suction temperature and line losses must be checked
  • 启动前需预冷,不能干转Must be pre-cooled; never run dry
  • 低温密封与保冷要求高,维护需专业培训Cryogenic seals and insulation demand trained maintenance
Configuration / 标准配置

标准配置Standard configuration

泵组Pump低温离心泵或柱塞泵,按流量与扬程选型Cryogenic centrifugal or reciprocating pump by flow and head
驱动Drive定速或变频,变频便于调节与软启动Fixed speed or VFD for turndown and soft start
预冷与回气Pre-cool and return设预冷管路与回气,控制泵入口温度Pre-cool line and vapour return to control suction temperature
汽蚀保护NPSH protection按介质温度核算净正吸入压头,保证 NPSH 余量NPSH margin verified against the saturated liquid temperature
监测Monitoring出口压力、轴承温度与振动监测Discharge pressure, bearing temperature and vibration
阀组Valves进出口低温截止阀、安全阀与放散Cryogenic stop valves, relief and vent
撬体Skid泵座与管路整体撬装,保冷层按介质配置Pump base and piping on one skid, with cold insulation

以上为常规配置,实际随机组按工况与用户管网条件确定,可按需增减。Standard scope shown; final scope is set by duty and network conditions, and can be adjusted.

Components / 主要零部件

主要零部件Main components

低温泵Cryogenic pump输送液氮、液氧、LNG 等低温介质Moves LN₂, LO₂, LNG and similar media
变频器VFD调速与软启动,减小汽蚀风险Speed control and soft start, limiting cavitation
低温截止阀Cryogenic stop valve进出口切断与预冷控制Inlet / outlet isolation and pre-cool control
回气管Vapour return line回气控制泵入口温度Controls suction temperature
压力/温度/振动传感器P/T/vibration sensors运行状态监测与联锁Condition monitoring and interlocks
安全阀Relief valve排出超压,保护泵与管路Protects pump and piping
控制柜Control cabinet启停、调速与报警Start/stop, speed and alarms

零部件的品牌与型号按项目技术要求与用户指定品牌确定,页内不限定具体厂家。Brand and model are fixed by project specification and the user's approved vendor list.

C / FAQ

常见问题FAQ

泵启动后流量上不来是什么原因?Why is flow low after start?

最常见是气蚀或吸入管有气袋。检查储罐液位、预冷是否完成、吸入管是否保温到位,再看泵进口过滤器是否堵塞。Usually cavitation or a gas pocket in the suction. Check tank level, whether cool-down finished, suction insulation, then the inlet strainer.

泵可以频繁启停吗?Can the pump start and stop frequently?

不建议。低温泵每次启动都要经历降温与建立液膜的过程,频繁启停加速密封与轴承磨损。用变频或回流调节更合适。No. Each start means cool-down and film establishment, and frequent cycling wears seals and bearings. Use a VFD or a recirculation bypass instead.

为什么泵体表面结霜?Why does the pump body frost?

保冷层或冷箱有缺陷,外界热量进入。结霜本身不是问题,问题是它意味着持续漏热,会降低效率并加剧气蚀。The insulation or cold box has a defect and ambient heat is getting in. Frost itself is not the issue — the continuous heat leak behind it is.

密封多久需要更换?How often are seals replaced?

取决于运行小时与启停次数,按厂家推荐周期并结合振动、温度监测判断。等到明显泄漏再换,往往已经损伤轴。By running hours and start count, per the maker's interval and backed by vibration and temperature trends. Waiting for visible leakage usually means the shaft is already damaged.

停泵后要注意什么?What after stopping?

按程序排液或保持冷态,维持吹扫,防止湿空气进入结冰;长期停机要按封存程序处理。Drain or keep cold per procedure, maintain purge so moist air cannot enter and freeze, and follow the preservation procedure for a long stop.

07 / Related

同类设备Related equipment

把你的工况发过来,我们出选型表Send your duty, we return a selection sheet

需要提供:介质、最大/最小流量、进口压力、出口压力、现场热源(电/热水/蒸汽)、安装场地条件。We need medium, min/max flow, inlet and outlet pressure, available heat source and site conditions.